Spangle Main Street Reconstruction Project – Ribbon Cutting Ceremony

Washington State TIB hosted a ribbon cutting ceremony on August 12, 2014 for the revitalization project in downtown Spangle.

The project used cement treated soils and concrete rubblization for a cost effective design benefiting the Town with over $150,000 in estimated savings. This project is featured as a showcase TIB project that improved the transportation needs for the area residents. In attendance were Spangle Council, residents, TIB Director, Steve Gorcester, TIB Engineer, Gloria Bennett and Belsby Engineering.